Reconstruction and resilience agenda

l’Horta Sud · Spain · 2025–2026

Technical data

Type of work
Strategic reconstruction planning
Scale
Municipal, with a catchment-scale strategy
Studio’s role
Operational direction and technical support; risk diagnosis, preamble and mapping
Action plan
29 measures · 8 operational objectives
Year
2025–2026
Status
Completed

Description

After the October 2024 DANA floods, the municipality needed more than a list of works: a plan to organise the reconstruction and to tell apart what had to be repaired from what had to change so as not to be exposed again. Direct material damage had been limited, but the event revealed a far greater risk: the town centre lies below the level the water reached.

The studio provides operational direction and technical support for the agenda, and from the outset separates two purposes: restoring what the flood damaged and reducing the risk the event brought to light. Each is funded through its own instruments and timeframes; keeping them apart allows every measure to be assigned to its fund with no overlaps.

The strategy rests on the studio’s own evidence, which complements the available mapping: the comparison of topographic surveys before and after the event, the reconstruction of the flood level and a section-by-section freeboard analysis. On that basis a catchment-scale strategy is drawn up —attenuation, defences and channel reshaping— together with a dedicated line of greening and permeable surfaces in the town centre.

The action plan brings together 29 measures —10 for reconstruction, 14 for adaptation and 5 for resilience— around eight operational objectives. Each measure has its objective, status, timeframe and indicators.

Gallery

Interpretive diagrams prepared by the studio from the strategy and the action plan, not to scale and without orientation.

Nine projects in l’Horta Sud.

Described by type, scale and stage.

  1. Reconstruction and resilience agendal’Horta Sud · 29 actions · Completed · 2025–2026
  2. Catchment study and DANA diagnosisl’Horta Sud · 5 sub-catchments · 2.7 km of channel · ~38,300 m³ eroded and ~47,700 m³ deposited · Diagnosis completed · 2026
  3. River channel clearance and reshapingl’Horta Sud · 2.7 km of channel · ~78,000 m³ removed · 1,750 m of bank with rock armour · Studies and outline design completed, permits in progress · 2026
  4. Channel renaturalisation and bioengineeringl’Horta Sud · ~570 m of rock armour ready for planting · 500 m of earth bank · 6 separable parts · Outline design in progress · environmental application submitted · 2026–2028
  5. Linear river park with flood-protection embankmentl’Horta Sud · ~1 km of riverside edge · Preliminary studies and concept · 2026
  6. Post-DANA reconstruction special planl’Horta Sud · ~51 ha of river-affected zone · 2.2 ha of floodable parks · Proposal submitted · 2025–2026
  7. Planning amendments for resiliencel’Horta Sud · 5 regulatory changes · 60 % of rainfall absorbed by SuDS · Detailed amendment approved · 2026
  8. Elevated crossing over a ravinel’Horta Sud · Deck of ~50 × 10 m · two lanes and a cycle and pedestrian path · Design in progress · 2026
  9. Urban regeneration and sustainable drainagel’Horta Sud · 6 projects · ~250 m² of draining tree pits and planters · ~500 m² of permeable playground · Detailed designs and costed reports · 2025–2026