Elevated crossing over a ravine

l’Horta Sud · Spain · 2026

Technical data

Type of work
Replacement of a flood-prone ford with an elevated structure
Scale
Local road infrastructure over a watercourse
Studio’s role
Design and construction management; outline solution and technical and administrative liaison with the body drafting the project
Deck
Around 50 × 10 m (~500 m²) · two lanes and a segregated cycle and pedestrian path
Hydraulic study
25-, 100- and 500-year return periods, calibrated against the 2024 DANA floods
Year
2026
Status
Design in progress

Description

A rural road crosses the ravine at grade, on a low embankment. During floods this ford behaves like a dam: it holds back the water, is overtopped and is cut off, just when it is most needed as an emergency route and a link with the neighbouring towns. Rebuilding it as it was would bring back the same geometry and the same weak point.

The starting decision is not to rebuild the ford but to replace it with an elevated structure that leaves the channel section clear and keeps the road open during a flood as well. The crossing no longer obstructs the flow and no longer acts as a single point of failure for the road network.

The outline solution proposes a deck of around 50 m in length and 10 m in width, some 500 m², with two lanes and a segregated cycle and pedestrian path for people on foot and by bike, who currently use verges and tracks. It is designed as a skewed slab on deep foundations, piles or micropiles with pile caps, because the structure bears on the channel and has to withstand scour. These dimensions are indicative: the design will set them.

The final sizing is determined by the hydraulic study. The design calculates the 25-, 100- and 500-year return-period flows, calibrates them against the October 2024 DANA floods and uses a two-dimensional model to check the freeboard and clearance under the deck, and that the new structure does not raise water levels upstream. The river basin authority’s permit is sought on the basis of that study.

Gallery

Interpretive diagrams prepared by the studio from the outline solution, not to scale; dimensions are indicative and will be set by the design.

Nine projects in l’Horta Sud.

Described by type, scale and stage.

  1. Reconstruction and resilience agendal’Horta Sud · 29 actions · Completed · 2025–2026
  2. Catchment study and DANA diagnosisl’Horta Sud · 5 sub-catchments · 2.7 km of channel · ~38,300 m³ eroded and ~47,700 m³ deposited · Diagnosis completed · 2026
  3. River channel clearance and reshapingl’Horta Sud · 2.7 km of channel · ~78,000 m³ removed · 1,750 m of bank with rock armour · Studies and outline design completed, permits in progress · 2026
  4. Channel renaturalisation and bioengineeringl’Horta Sud · ~570 m of rock armour ready for planting · 500 m of earth bank · 6 separable parts · Outline design in progress · environmental application submitted · 2026–2028
  5. Linear river park with flood-protection embankmentl’Horta Sud · ~1 km of riverside edge · Preliminary studies and concept · 2026
  6. Post-DANA reconstruction special planl’Horta Sud · ~51 ha of river-affected zone · 2.2 ha of floodable parks · Proposal submitted · 2025–2026
  7. Planning amendments for resiliencel’Horta Sud · 5 regulatory changes · 60 % of rainfall absorbed by SuDS · Detailed amendment approved · 2026
  8. Elevated crossing over a ravinel’Horta Sud · Deck of ~50 × 10 m · two lanes and a cycle and pedestrian path · Design in progress · 2026
  9. Urban regeneration and sustainable drainagel’Horta Sud · 6 projects · ~250 m² of draining tree pits and planters · ~500 m² of permeable playground · Detailed designs and costed reports · 2025–2026