rubénbeltrán · arquitectura · urbanismo · consultoría

Planning amendments for resilience

l’Horta Sud · Spain · 2026

Technical data

Type of work
Amendments to the general plan
Scale
Municipal · new developments
Studio’s role
Technical support to the municipal services; drafting of the reports, regulations and plans
Approved amendment
5 regulatory changes, one on rainwater
Drainage
Separate networks · SuDS for 60 % of the area’s rainfall
Period
2024–2026
Status
Detailed amendment approved

Description

The municipality’s general plan is more than twenty-five years old. Its drainage regulations did not require separate sewer networks and, for stormwater, simply set an absorption rate of no less than 50 % in the calculation of flows, with a return period of at least 25 years. After the flood of October 2024, and alongside the planning of the riverside set out in the special plan, the studio has prepared a number of amendments to the general plan itself so that the town built from now on manages rainwater to current standards.

The piece already approved is a detailed amendment with five regulatory changes, one of which concerns rainwater. In new development units, drainage must be separate —foul water on one side, stormwater on the other— and stormwater from streets and green spaces is managed exclusively through sustainable drainage systems (SuDS). Buried stormwater pipes are reserved for draining buildings. The aim is to improve wastewater treatment, save water and energy and meet the legal requirement for separate networks in integrated developments.

The SuDS are sized to absorb 60 % of the rainfall over the whole area, with a return period of at least 25 years or with retention volumes set by zone and street type: from 8 mm in the urban extension and on narrow streets to 60 mm in parks and gardens. In this way, much of the rain stays where it falls instead of loading the network.

Gallery

Interpretive diagrams prepared by the studio from the new drainage regulations, not to scale.

Nine projects in l’Horta Sud.

Described by type, scale and stage.

  1. Reconstruction and resilience agendal’Horta Sud · 29 actions · Completed · 2025–2026
  2. Catchment study and DANA diagnosisl’Horta Sud · 5 sub-catchments · 2.7 km of channel · ~38,300 m³ eroded and ~47,700 m³ deposited · Diagnosis completed · 2026
  3. River channel clearance and reshapingl’Horta Sud · 2.7 km of channel · ~78,000 m³ removed · 1,750 m of bank with rock armour · Studies and outline design completed, permits in progress · 2026
  4. Channel renaturalisation and bioengineeringl’Horta Sud · ~570 m of rock armour ready for planting · 500 m of earth bank · 6 separable parts · Outline design in progress · environmental application submitted · 2026–2028
  5. Linear river park with flood-protection embankmentl’Horta Sud · ~1 km of riverside edge · Preliminary studies and concept · 2026
  6. Post-DANA reconstruction special planl’Horta Sud · ~51 ha of river-affected zone · 2.2 ha of floodable parks · Proposal submitted · 2025–2026
  7. Planning amendments for resiliencel’Horta Sud · 5 regulatory changes · 60 % of rainfall absorbed by SuDS · Detailed amendment approved · 2026
  8. Elevated crossing over a ravinel’Horta Sud · Deck of ~50 × 10 m · two lanes and a cycle and pedestrian path · Design in progress · 2026
  9. Urban regeneration and sustainable drainagel’Horta Sud · 6 projects · ~250 m² of draining tree pits and planters · ~500 m² of permeable playground · Detailed designs and costed reports · 2025–2026